This assignment was to create a partial interchange and toll station on the A40 motorway towards Geneva.
Construction work:
- Creation of an entrance and an exit road with a 700 m acceleration/deceleration lane,
- Creation of a flyover on the A40,
- Bracing of the stone covering on the adjacent structure,
- Creation of a closed tolling system, including:
- 2×2 lanes (plus 2×1 reservation),
- A lodge in the central reservatio,
- A service building,
- An awning.